Construction of 110 KV cable lines for connection of 110/10 KV Substation “VCF”

2010
Complex works.
Two 110 KV cable lines for connecting 110/10 KV Substation”VCF” to 110 KV mains in Vinnytsia, with a length of 650 m run and using a cable with crosslinked polyethylene cross section of 240/95 mm2 (Al).

Construction of 110/10 KV Substation “PGP glassworks”

2013
Complex works.
Working project, construction, installation and commissioning: construction of 110/10 KV Substation LLC “PGP glassworks”

External power supply by cable lines from 10 KV indoor switchgear of the substation 110/35/10 KV “Zaozerna”

2015
Working project.
External power supply of slaughter department of broiler chickens slaughter complex “Vinnytsia broiler” by 10 KV cable lines from indoor switchgear-10 KV of the substation 110/35/10 KV “Zaozerna” to the indoor switchgear-1,2 10 KV (2nd stage)

Construction of a new 35/10 KV Substation “Bilousivka”

2015
Construction, Installation and Commissioning.
Construction of a new 35/10 KV Substation “Bilousivka” with reconstruction of TM and automatic system for commercial accounting of power consumption at 110/35/10 KV Substation “Zaozerna” and “KKZ”.

Construction of the external power supply scheme of LLC “BC “Roshen”

2017
Design works.
Construction of a factory for the production of flour products at Pryvokzalna Street, 82 in Boryspil. 1st launch complex of the 1st stage of construction. Construction of the scheme of external power supply.

Construction of a new 110/10 KV Substation “VCF”

2010
Complex works.
Construction of a new 110/10 KV Substation”VCF” with transformers 2×25 MWA, with the scheme of the internal load switchgear-110 KV of 110-2 type and the scheme of the indoor switchgear-10 KV of 10-1 type.

Construction of 110 KV cable lines for connection of 110/10 KV Substation “VCF”

2010
Complex works.
Two 110 KV cable lines for connecting 110/10 KV Substation”VCF” to 110 KV mains in Vinnytsia, with a length of 650 m run and using a cable with crosslinked polyethylene cross section of 240/95 mm2 (Al).

Construction of a 110 KV cell on 330/110/35 KV Substation “Bar”

2011
Construction, Installation and Commissioning.
Construction of 110 KV cell on substation 330/110/35 KV “Bar” to provide external power supply to a stationary traction substation on the station Komarivtsiwith delivery of materials and equipment

Installation of production lines equipment (ROSHEN)

2014
Construction, Installation and Commissioning.
Installation of production lines equipment of ROSHEN corporation

Construction of biogas plant 0,99 MW

2015
Complex works.
The working project, construction, installation and commissioning works on the creation of the complex engineering structure for production of electric power of biogas at the landfill of solid domestic wastes with the capacity up to 1 MW and thermal energy up to 1.2 MW.

Supply, installation and commissioning of the main electrical equipment of 110/10 KV Substation “Prybuzka”

2015
Construction, installation and commissioning:
Substation 110/10 kV “Prybuzka”. Supply, installation and commissioning of the main electrotechnical equipment 110 kV and 10 kV on the basis of GIS-110 kV produced by ZF10-12G Shandong Taikai Power Engineering Co LTD (China). Supply, installation and commissioning of computer-aided control system of technological process, power system protection, connection and station part of fiber-optics connection line on the basis of PSC terminals produced by NR Electric Co. LTD (China).

Construction of CL-10 KV for the connection of PVS LLC “Primewood”

2016
Construction, Installation and Commissioning.
Construction of CL- 10 KV for the connection of PVS LLC “Primewood” on the territory of Voynashivska village council Bar district Vinnytsia region to the mains of PJSC “Vinnytsiaoblenergo”

Construction of CL-10 KV for the connection of PVS LLC “Leader”

2016
Construction, Installation and Commissioning.
Construction of CL- 10 KV for the connection of PVS LLC “Leader” on the territory of Chechelnyk Village council Vinnytsia region to the mains of PJSC “Vinnytsiaoblenergo”

Construction of CL-10 KV (PVS LLC “Rendgy Tomashpil”)

2017
Construction, Installation and Commissioning.
Construction of CL -10 KV for transmission of generated power by PVS LLC ” Rendgy Tomashpil” into the mains of PJSC “Odessaoblenergo” on the territory of Kulevcha Village Council Sarata district Odessa region.

Construction of transmission line and internal load switchgear 35 KV PVS LLC “Sungreenenergy”

2017
Construction, Installation and Commissioning.
Construction of 35 KV transmission line in the cut of 35 KV power line “Temp-Yukhny” and internal load switchgear 35 KV for the connection of solar power station of LLC “Sungreenenergy” on the territory of Kyiv region, Boguslav town

Construction of СL-10 KV (PVS “Rubanivka”)

2017
Construction, Installation and Commissioning.
Construction of Cl-10 KV for transmission of generated power of PVS “Rubanivka” into the mains of PJSC “Khersonoblenergo”

Construction of 110/10 KV Substation “Biscuit” (1st launch complex of the 1st stage of object construction)

2017
Complex works.
Construction, installation and commissioning and putting into operation of 110/10 KV Substation”Biscuit” 1st launch complex of the 1st stage of object construction “Construction of a factory for the production of flour products at Pryvokzalna Street, 82 in the city of Boryspil”.

Construction of power line and reconstrucrion of 110/35/10 KV Substation “Dunaevtsi”

2017
Complex works.
Working project, construction, installation and commissioning for connection to electric mains of PJSC “Khmelnytskoblenergo”of solar power station LLC “Ekotekhnik Dunaevtsi”, that is situated on the territory of Demiankivtsi village Dunaevtsi district, Khmelnytsky region: new construction of power line and reconstruction of 110/35/10 KV substation “Dunaevtsi”.