Connection of industrial enterprises
Construction of 10 KW cable lines between 110/10 KW Substation "VCF"
Two 10 KW cable lines between 110/10 KW Substation “VCF” and TS-78, with a length of 6700 m each, using a cable with insulation of cross-linked polyethylene with a cross section of 500/50 mm2 (Al), with the organization of transposition of screens cycle.
Construction of a new 110/10 KW Substation "VCF"
Construction of a new 110/10 KW Substation “VСF” with transformers 2х25 МВА, with the scheme of internal load switchgear-110 KW of 110-2 type and the scheme of the indoor switchgear-10 KW of 10-1 type.
Reconstruction of 110/10 KW Substation "VZTA"
Reconstruction of 110/10 KW Substation “VZTA” in Vinnytsia (110-6, 2х63 МВА) – installation of sectional SF circuit breaker.
Reconstruction of electric power supplies of PJSC "Vinnytsia Confectionery Factory"
Reconstruction of electric power supplies in Vinnytsia. Replacement of 10 protection panels of 110 KW transmission line by microprocessor protection panels of “Diamant” type and panels of emergency automation at five substations 110 KW.
Connection of 110/10 KW Substation "VCF"
Two 110 KW cable lines for connection of 110/10 KW Substation “VCF” to the grid 110 KW in Vinnytsia, with a length of 650 m run and using a cable with insulation of cross-linked polyethylene with cross section of 240/95 mm2 (Al).
Reconstruction of 35/10 KW Substation "MMK"
Reconstruction of 35/10 KW Substation “MMK” of PJSC “Bershadmoloko”.
Reconstruction of TS 10 / 0.4 KW PJSC "Vinnytsia Confectionery Factory"
Reconstruction of TS 10 / 0.4 KW PJSC «Vinnytsia confectionery factory» (4 x 2500 KVA) with installation (replacement) of 5 cells of 10 KW switchgear and power supply of fountain “ROSHEN”.
Installation of equipment for production lines of PJSC "Vinnytsia Confectionery Factory"
Installation of equipment for production lines of ROSHEN corporation.
External power supply by cable lines from 10 KW indoor switchgear of the substation 110/35/10 KW "Zaozerna"
External power supply of slaughter department of broiler chickens slaughter complex “Vinnytsia broiler” by 10 KW cable lines from indoor switchgear-10 KW of the substation 110/35/10 KW “Zaozerna” to the indoor switchgear-1,2 10 KW (2nd stage).
Organization of load operating measurements of 10 KW switchgear "Barlinek"
Organization of load operating measurements of 10 KW switchgear “Barlinek”.
Repair of two air-cable lines 10 KW of LLC "Barlinek Invest"
Repair of two air-cable lines 10 KW with replacement of 10 KW terminating oil circuit breakers with vacuum ones.
Reconstruction of 10 KW switchgear "Barlinek"
Reconstruction of 10 KW switchgear «Barlinek» with complete replacement of relay protection equipment.
Construction of a new 35/10 KW substation "Bilousivka"
Construction of a new 35/10 KW substation Bilousivka with reconstruction of TM and automatic system for commercial accounting of power consumptionat 110/35/10 KW substation “Zaozerna” and “KKZ”.
Reconstruction of the 750 KW open switchgear substation of LLC "BC "Roshen"
Construction of a factory for the production of flour products on Pryvokzalna Street, 82 in the city of Boryspil. 1st launch complex of the 1st stage of construction. Construction of the scheme of external power supply.