Ресурс 4 Ресурс 3 Ресурс 3 Ресурс 4 Ресурс 3 Ресурс 3
EPC-Partner
in electric power
engineering
+
Integrated
experience in
traditional and
renewable
energy
+
Manufacture
of
Ukrainian
inverter
equipment
and
steel-work for
PVS
and not only
+
Reduction of
CO2
emission
-132 375
ton /year
+
124 MW peak
of solar stations
of which
83 MW peak
constructed
during2016
CREATING
SOLUTIONS
FOR ENERGY
OF FUTURE
Maximal care of investors’ interests. Full complex of works from development,
equipment production to service of object
Full EPC
Service “FULL EPC” (Еngineering, Procurement, Construction) - is a complete set of measures for implementation of an investment and construction project (solar station), as the general contractor, from the selection of the construction object, collection and preparation of initial permits up to the commissioning and connection to the electric mains.
Industrial solar power station "Turnkey"
Service EPC + certified equipment of domestic production + network reconstruction and construction of load output outline for connection of solar power station to the network + support of licensing and agreement procedures for the obtaining of the “green” tariff.
Full Investment
For investors the service “Full Investment” is the possibility of profitable investment of finance, namely the search and selection of projects for investment, analysis of investment attractiveness of projects in accordance with the expectations of an investor, the calculation of the optimal business model of investing in selected projects, providing with additional guarantees on the efficiency of investment and reduction of financial risks for investors.
Design
We design and substantiate the optimum solution for creating reliable power supply systems of any complexity and specificity.Design begins with the individual approach to solve each technical problem to provide maximum technical and economic feasibility of the system which the customer needed.
Production
Production of the equipment and steel structures for the construction of PV stations, reconstruction and construction of distribution substations and power lines.
Service of SPS
«Full Service» - provides operating and maintenance servicing for the insurance of the most efficient working capacity of solar power plants and minimizing the cost of ownership of solar power station
  • Renewable energy
  • Service of SPS
  • Backbone & distribution networks
  • For industrial companies
  • < 5 MW
  • 5 – 10 MW
  • 10 MW +
2016
PPS 2,5 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Velyton-2.5" in the village Novooleksiyivka Genichesk district, Kherson region
Number of panels:
10 406 pcs
Unit
panels power:
260 W
Area:
5,3 ha
Reduction of CO2:
3 385 tons/year
Power:
2,7
MW peak
2016
PPS 2,8 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Podilla Solar Pro” on the territory of Verhivska village council Barsky district of Vinnitsa region
Number of panels:
12 232 pcs
Unit
panels powe:
260 W
Area:
6 ha
Reduction of CO2:
3 480 tons/year
Power:
3,2
MW peak
2016
PPS 1,5 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Mezhyrich" on the territory of Mezhyritska village council, Pavlograd district, Dnipropetrovsk region
Number of panels:
6 204 pcs
Unit
panels power:
265 W
Area:
3,2 ha
Reduction of CO2:
3 130 tons / year
Power:
1,6
MW peak
2015
PPS 3,2 MW
ЕРС
The detailed design, construction and commissioning photovoltaic power plant "Renji Trostianets" Glybochok village, Trostyanetsky district, Vinnitsa region. The second phase of construction, the second launch complex.
Number of panels:
15 224 pcs
Unit
panels power:
260 W
Area:
7,2 ha
Reduction of CO2:
4 395 tons/year
Power:
3,96
MW peak
2015
Biogas Power 0.99 MW
ЕРС
The detailed design, construction and commissioning. Integrated engineering construction for the production of electricity from biogas at landfill.
Power:
0,99
MW peak
2016
PPS 6,05 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Podilla Solar Pro" in the Barsky district of Vinnitsa region
Area:
11,7 ha
Unit
panels power:
260 W
Number of panels:
26 224 pcs
Reduction of CO2:
7 264 tons/year
Power:
6,8
MW peak
2016
PPS 5,7 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Velyhen-6.0" in the village Novooleksiyivka Genichesk district, Kherson region (adjusting the project).
Area:
11,8 ha
Unit
panels power:
260 W
Number of panels:
25 806 pcs
Reduction of CO2:
8 150 tons/year
Power:
6,7
MW peak
2016
PPS 7 МВт
ЕРС
Construction of terrestrial photovoltaic power plants "Praymvud" on the territory of Voynashivska village council Bar district, Vinnitsa region
Area:
14,5 ha
Unit
panels power:
265 W
Number of panels:
31 042 pcs
Reduction of CO2:
8 855 tons/year
Power:
8,2
MW peak
2016
PPS 6 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Energosolar Pro" on the territory of Kopayhorodska village council Bar district, Vinnitsa region
Area:
12,8 ha
Unit
panels power:
260 W
Number of panels:
27 544 pcs
Reduction of CO2:
7 965 tons/year
Power:
7,3
MW peak
2016
PPS 8 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Stanislavchyk" on the territory of Stanislavchytska village council Zhmerynka district, Vinnitsa region
Area:
17,7 ha
Unit
panels power:
265 W
Number of panels:
37 048 pcs
Reduction of CO2:
10 830 tons/year
Power:
9,8
MW peak
2016
PPS 8 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Renji Sarata" near the city Sharhorod, Vinnytsia region
Area:
15,3 ha
Unit
panels power:
265 W
Number of panels:
36 045 pcs
Reduction of CO2:
10 460 tons/year
Power:
9,5
MW peak
2016
PPS 16 MW
ЕРС
Construction of terrestrial photovoltaic power plants "Chechelnik" on the territory of Chechelnitska village council. The two phase of construction per 8 MW.
Area:
34,3 ha
Unit
panels power:
265 W
Number of panels:
74 228 pcs
Reduction of CO2:
22 100 tons/year
Power:
19,7
MW peak
2016
Wind power energy
Feasibility study. Scheme issuing wind power capacity of "Ovid Wind" 30 MW, city Ovidiopol.
Power:
30
MW peak
2016
Wind power energy
Feasibility study. Scheme issuing wind power capacity of "Ovid Wind ll" 51 MW, city Ovidiopol.
Power:
51
MW peak
2015
Wind power energy
Feasibility. The scheme of issuing power wind power capacity of 30 MW, located outside the village on the territory of Dalnytska village council, Ovidiopol district of Odessa region, to the power grids of PJSC "PC" Odesaoblenergo. "
Power:
30
MW peak
Power:
111,7MW peak
18 solar power plants serviced 24/7/365,
432 964 - the number of panels
227 inverters
2016
Reconstruction of protection of L-110 kV
Reconstruction with installation of modern microprocessor protections of the SS 110/35/10 "Sharhorod", 110/10 "Mogilev-Podolsky," SS 110/35/10 "Jmerinka" and complete reconstruction of the TVmechanic system SS 110/35/10 "Sharhorod" and SS 110/35/10 "Jmerinka" based on TVmechanic device «RTU» of ABB company
2016
Reconstruction scheme of issuing power Dniester HPP-2
Project work
Reconstruction of pressure transmitters Dniester HPP-2.
Construction of a 110 kV and reconstruction PRZA.
Reconstruction of hub-station and measures 35 kV.
2015
Construction of double-transformer substation 110/10 KV “Prybuzka”
The construction of double-transformer substation 110/10 KV “Prybuzka” of closed type in Khmelnitsky town is completed. We performed works on installation and commissioning of switchgear 110 KV and switchgear 10 KV and also of power system protection equipment, computer-aided control system of technological process, registration and connection system`s equipment, full range of commissioning works for the turning of the substation into operation has been accomplished.

Implementation of Customer facility included installation of equipment of world-wide known manufacturers Shandong Taikai Power Engineering Co., Ltd and NR Electric Co., Ltd, which was for the first time applied in the domestic market. To work with the equipment, our specialists have been trained and certified on the manufacturing plants of Chinese partners.
2015
SS 330 kV (working project)
  • SS 330 kV "Novoodesska." Reconstruction ASSL (automatic shutdown system load).
  • SS 330 kV "Kakhovka". Reconstruction of RZA devices of 330 kV «Zaporizhzhya TPP"
  • SS 330 kV "Kakhovka". Reconstruction of RZA devices of 330 kV "Krivorozhskaya" TPP.
  • SS 330 kV "Usatove." Reconstruction ASSL (automatic shutdown system load)
  • Technical re-equipment of 330 kV SS "Shepetivka" ASE-330 kV with replacement of oil transformers voltage 330 kV gas-insulated.
  • Technical re-equipment of reception and transmission of commands RZA and PA L-330 kV "Vinnytsia 750" - "330 Vinnytsia".
  • SS 330 kV "Chernivtsi". PL-330 kV "Ivano-Frankivsk". Replacement devices of reception and transmission of commands RH and PA AKPAtype on the equipment type AKA-16 (32).
2015
The scheme of perspective development of power grids by 2025
Pre-design work on development schemes of perspective development of electric networks 35-110 kV Ternopil region, 10 kV networks Ternopil city until 2020, with the prospect of 2025
2013
Substation “Musiivka”
Construction and commissioning work on modernization cells (10 pcs.) Open switchgear 154 kV traction substation "Musiyivka" SE "Dnieper railway.
2015
Feasibility Study for the project of interstate exchange of electricity
Feasibility study of electrical networks Chernivtsi region for the project interstate exchange of electric energy between Ukraine and Romania.
2015
Substation 35/10 kV for the factory “Myronivsʹkyy khliboprodukt”
Construction of a new 35/10 kV substation "Bilousivka" with reconstruction ТМ and АСКОЕ at SS 110/35/10 kV "Zaozerne" and "KKZ"
2015
110/10 kV Substation LLC "Piskivskyy Glassware Factory"
To ensure a reliable power supply of "Piskivskyy Glass Factory," we built a new 110/10 kV substation. Team KNESS (of "Podolsky Energy consulting") completed a working draft, construction and commissioning
2010
110/10 kV Substation “VCF” (Roshen)
We construct a new 110/10 kV substation "TCF" capacity of 30 MW for a new "Vinnitsa Confectionery Factory". The substation supplies electricity to new and old confectionery factories, located in different parts of the city. The old factory connected to the substation using cable lines 10 kV with polyethylene shytoho length of 7 km. Completed design and technical solutions provide both factories and power supply reliability category and class and power consumption.
PVS
82,3MW
p
2016
EPC
PVS
21
since 2012
INSTALLED
500 000
SOLAR MODULES
REDUCTION of СО2
111 000
ton/year
45DAYS DEVELOPMENT
EPC
90DAYS CONSTRUCTION and MOUNTING
ENSURING MONITORING AND REPORTING
24/7/365
FOR 18 PVS
Opening of the solar station "Balky"

Bright fall season end! November 18, 2016 the grand opening of another solar station "Balky" 7 MW with the “real-time” inclusion! In 2016 Vinnitsa region goes into the lead on the introduction of "green energy" and the number of constructed and commissioned PSS. This achievement was made possible largely thanks to the energy holding KNESS.

18.11.2016
KNESS Holding launches "Energy Nights" - a series of “round tables” with a subject of renewable energy

Since October launched a new platform for meetings and discussions between experts and all comers on the use of renewable energy in Ukraine, development of the solar energy market, transformation of the energy system of Ukraine.

October 2016
The third "Energy Night" held this autumn

Choosing the position of "creator" of the new solar industry, holding KNESS activated communication and interaction environment for experts. No company or government structure alone can not change the country's industry, independently solve all the institutional objectives, innovation, human resources and so on. Each new Energy Night - an opportunity to establish new relationships, the birth of new ideas and rethinking the challenges of today.

November 2016
Fourth Energy Night

How can we transform the state to approach the green tariff to ensure the investment attractiveness of the industry? Will be reached the goal of 11% renewable energy and the need to radically change the situation? And many other issues of solar energy discussed in open format on the fourth Energy Night of KNESS.

November 2016
The final fifth Energy Night closing the season-2016

Holding KNESS thank everyone who care, who in the last few months actively participated in the discussion of a wide range of issues of renewable energy within our platform "Energy Nights". Only open communication model is effective in developing innovation in the energy sector. Only joint efforts will create a dynamic, strong industry. So we are looking forward to your participation in future meetings.

December 2016
Opening of the solar station "Balky"
KNESS Holding launches "Energy Nights" - a series of “round tables” with a subject of renewable energy
The third "Energy Night" held this autumn
Fourth Energy Night
The final fifth Energy Night closing the season-2016
The main office
Vinnytsia
Honty st., 39 A
Tel./fax: +38 (0432) 55-48-44
Kyiv
Nyzhnii Val st., 15, office 504
Tel./fax: +38 (044) 373-68-78
Kherson
Soborna st., 5
Tel. +38 (096) 730 17 74
KNESS Serviсe
Vinnytsia
Khmelnytskyi road, 13
office 425
Tel./fax: +38 (0432) 50 72 50
KNESS Product
Vinnytsia
Energetychna st., 5
Tel./fax: +38 (0432) 50 85 74
The main office
Honty st., 39 A, Vinnytsia, 21017
Kyiv
Nyzhnii Val st., 15, office 504, Kyiv, 04071